{"product_id":"9780833042989","title":"Insights on Aircraft Programmed Depot Maintenance: An Analysis of F-15 PDM","description":"\u003cp\u003eThis technical report describes the F-15 programmed depot maintenance (PDM) process as performed at the Warner Robins Air Logistics Center (WR-ALC) in FYs 2004-2006. The average WR-ALC F-15 PDM visit runs behind schedule and lasts about four months. Also, PDM can wait a long time for parts; aircraft move through PDM steps out of sequence, with missing parts catching up with the aircraft when they become available, or cannibalize other aircraft.\u003c\/p\u003e","brand":"RAND Corporation","offers":[{"title":"Default Title","offer_id":47026959057136,"sku":"9780833042989","price":17.59,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0737\/7593\/9824\/files\/9780833042989_p0.jpg?v=1763757024","url":"https:\/\/shop-qa.barnesandnoble.com\/products\/9780833042989","provider":"Barnes \u0026 Noble (DEV)","version":"1.0","type":"link"}